Claudio C. Araya
#095//OMA - Reinier de Graaf//Brussels, Belgium//2020
1st Prize - International Competition

SNCB/NMBS RAILWAY HQ.

OMA - Reinier de Graaf / 1st Prize, OMA Team Entry

Project Description /

A 75,000 m² headquarters for 4,000 employees of Belgium’s national railway at Brussels-South. The competition, won by OMA (Partner Reinier de Graaf) with Jaspers-Eyers Architects, keeps three monumental buildings from the 1958 Brussels World’s Fair along Avenue Fonsny and bridges them with an eleven-storey, 236-metre linear volume along the tracks. The glazed trackside façade puts the workspaces on view; a three-storey street lobby adds retail and direct platform access, and rooftop gardens sit on the restored heritage blocks.

Role & Technical Contributions /

Architectural Intern in the competition team, under Associate Mark Veldman during the final submission phase. Rebuilt the main architectural scale model from scratch with Rhino and laser cutting: a demountable, internally lit sectional model showing the interface between the 1958 buildings and the new volume, and coordinated its photography. Then produced analytical diagrams, standardised 3D furniture libraries and ran large-format print proofs and bookbinding. Joined the senior team at the jury defence in Brussels to set up the exhibition and operate the models.

PracticeOMA (Partner: Reinier de Graaf // Assoc.: Mark Veldman)
RoleArchitectural Intern, Competition Team // Physical Model // Diagrams // Furniture Library // Presentation Material
Team / CollabsJaspers-Eyers // BESIX, BPC & Immobel // Bureau Greisch // Boydens & CES // Callebaut Architecten
Type / StatusMetropolitan Infrastructure & HQ // Intl. Competition – 1st Prize [2020 - In Development]
Location / ScaleBrussels, Belgium // 75,000 m² GFA (4,000 Employees) // Phases: Competition, Prototyping & Jury Defence
CONCEPT
DESIGN DEVELOPMENT
DETAIL
FABRICATION / TENDER
SITE

Black = phases I worked on. Grey = not involved.

SNCB/NMBS RAILWAY HQ. - Primary architectural platePhoto: Frans Parthesius
SNCB/NMBS RAILWAY HQ. - Secondary architectural viewPhoto: Frans Parthesius

5309 × 5309 px Architectural Documentation Sheet

Drawings & Technical Sheet

236m Trackside Volume, 1958 Heritage Buildings Interface & Sectional Model Drawings

236m Trackside Volume, 1958 Heritage Buildings Interface & Sectional Model Drawings100%
SNCB/NMBS RAILWAY HQ. - 236m Trackside Volume, 1958 Heritage Buildings Interface & Sectional Model Drawings
Click to zoom · Drag to pan · Keys: + / - · 0 reset · F fullscreen · I invert

Have a competition or project coming up where this way of working fits?

Start a conversation
SNCB/NMBS RAILWAY HQ - OMA - Reinier de Graaf // In Development [2020]