Claudio C. Araya

The Extended Cut.

Proof that more work was actually done.

Behind the Selected Works presented in detail lies a broader paper trail of 100+ projects developed between 2015–2026. Because a curated portfolio only shows the tip of the iceberg, the following grid gathers the complete record, from built commissions and first prize competitions to speculative research, 3:00 AM iterations, and honourable casualties.

A portfolio shows the peaks. This is the terrain: built work, competitions won and lost, studies, collaborations and the occasional landslide. Every entry states what it was and how much of it was mine, because a map is only useful if the scale is honest.

Description /

Extracting key milestones from a decade-long archive of 100+ projects, this index is organised as a typological and chronological sampling. Each entry records the project’s primary programme, geographical location, scale, collaboration structure, and final status (built, under construction, awarded or competition entry). Viewed together as a continuous matrix of models, diagrams, and visuals, the catalogue reveals recurring obsessions in geometry, modularity, and tectonic assembly across housing (18), cultural buildings (18), pavilions (15), retail (5) and masterplans (14), among others.

InvolvementLead 53 // Proposal 6 // Team 24 // Support 28 (levels as marked in the Project Log; 111 entries)
Scope / Timeline100+ Projects & Studies // 20+ Countries // 2015–2026 (Chile, Netherlands, Austria, Italy, China, USA, ME)
Program MixHousing 18 // Cultural & Museums 18 // Pavilions 15 // Retail 5 // Masterplans 14 // Public Space 4 // Civic 4
Output / StatusBuilt or under construction 6 // Commissions 39 // Competitions 46 // Academic 12 // Proposals 7 // Other 1
Loading index...